ISO9001 Quality Management System
A standardized quality management system ensures stable product quality from the ground up
ISO9001 Certified
Certified by the International Organization for Standardization
Standardized Operations
SOP standard work instructions for every production step
Dedicated QC Staff
Full-time quality inspectors at each stage, clear accountability
Full Traceability
Quality records for every batch, complete traceability
ISO9001 Quality Management System Certification
Certified by INGEER Certification, globally recognized and verifiable online
Original certificate scan · Click to enlarge
Certificate Details
Multi-stage Inspection from Raw Material to Shipment
Inspection checkpoints at every stage. Regardless of which processes a product goes through, it must pass final QC manager inspection before shipment.

Test MFI & density

Real-time appearance inspection

Ink adhesion testing

Appearance & easy-tear check
💡 Note: The 4 process inspections are parallel checkpoints - products go through the relevant processes based on their type. For example: film-only products go through "Raw Material + Film Blowing" inspection and then directly to QC Manager Final Inspection; printed products add "Printing" inspection; bag products add "Bag Making" inspection. Regardless of which processes are involved, all products must pass QC Manager Final Inspection and Pre-shipment Inspection before shipment.
6 Workshop Enterprise Quality Standards, Full Coverage
Each workshop has its own enterprise quality standard document, with internal control indicators stricter than or equal to national standards
Blown Film · PE Heat Shrink
Q/RY 01-2026PE heat shrinkable film, for raw material incoming, in-process and final inspection
Blown Film · LDPE
Q/RY 02-2026Low density polyethylene blown film, for raw material incoming, in-process and final inspection
Blown Film · HDPE
Q/RY 03-2026High density polyethylene blown film, for raw material incoming, in-process and final inspection
Printing Workshop
Q/RY 02-2026Gravure printing on plastic film, for PE shrink film, LDPE, HDPE printing process
Slitting & Folding
Q/RY 04-2026Film slitting, folding, gusseting, edge sealing process inspection
Bag Making Workshop
Q/RY 03-2026Plastic bag heat sealing, cutting, forming process inspection
Standardized Inspection Rules, Every Batch Documented
All 6 workshops follow unified standardized inspection rules, ensuring consistent and traceable quality judgment
Batch Definition
Same raw material, same process, same spec continuous production = one batch. Film ≤40 rolls/batch, bags ≤20,000 pcs/batch
Sampling Rules
First article mandatory inspection. Film: at least 1 check per 10 rolls. Printing/bag making: patrol every 30 min. First article signed by operator + QC
Final Inspection
Width tolerance, thickness, grammage, appearance = mandatory per batch. Other items per customer request or at least once per week sampling
Type Inspection
Full item inspection for: new product launch, major raw material/process change, every 6 months normal production, resuming after 6+ months shutdown
Judgment Rules
All items pass = batch qualified. Failed items: double sampling re-test. Still fails = batch unqualified, handled per Nonconforming Product Control Procedure
Professional Testing Equipment, Data-Driven Quality
Equipped with a full range of plastic packaging testing instruments, every performance indicator is backed by precise data

Thickness Gauge
0.001mm precision, measures film thickness uniformity

Tensile Tester
Tests tensile strength, elongation at break, tear strength

Seal Tester
Tests bag seal strength, sealing performance, leakage rate

Heat Shrinkage Tester
Tests MD/TD shrinkage rate and shrink temperature of films
Haze Meter
Measures film transparency, haze, and glossiness
Friction Coefficient Tester
Measures film surface friction coefficient for smooth machine feeding
Temperature Resistance Tester
Tests high/low temperature resistance for different applications
Print Quality Inspector
Online inspection of print registration, color difference, defects
Enterprise Standards Exceed National Standards
Every product is tested against both national standards and our internal enterprise standards, with stricter requirements
* Typical values above. Specific indicators vary by material and specification. Refer to actual test reports.
EU PPWR Compliance Certification
Products tested and passed EU Packaging and Packaging Waste Regulation (EU) 2025/40 hazardous substance tests, SGS certified, worry-free export to EU
SGS Test Report Information
All hazardous substance tests passed
Test Items
Original SGS Test Reports (4 reports)
PE Film · Four Heavy Metals
Article 5(4) · Pb, Cd, Hg, Cr VI
PE Film · Total Fluorine
Article 5(5) · Total Fluorine
POF Film · Four Heavy Metals
Article 5(4) · Pb, Cd, Hg, Cr VI
POF Film · Total Fluorine
Article 5(5) · Total Fluorine
Quarterly Third-party Authority Testing, Quality Guaranteed
In addition to in-house self-inspection, we commission third-party authoritative institutions for full testing every quarter
SGS Testing
Quarterly full performance testing by SGS S.A., including physical properties, hygienic performance, and hazardous substance migration.
PPWR Compliance
Tested per EU Packaging and Packaging Waste Regulation (PPWR), ensuring products meet EU export environmental requirements - recyclable and degradable indicators compliant.
Other Third-party
CTI, ITS, TUV and other third-party test reports available upon request, plus food-grade FDA certification, REACH testing, ROHS testing and other specialized reports.
📄 Quality Documents Included with Every Shipment
Quality is Our Promise
From raw material to shipment, multi-stage inspection ensures every batch stands up to testing
What We Did For Quality Inspection

All personnel learn quality standards
View more

Key personnel conduct group testing
View more

Implementation of quality standards
View more

We continue to invest in machinery
View more

